2017, Turn-key project
Supply and Installation of Transmission Meter/Data Center
2017, Turn-key project
110/10 kV GIS Substation in GSA, Elbasan –Second Phase
2016, Turn-key project
Measuring of electrical Energy in Drin Cascade
2014, Turn-key project
Measuring of Electrical Energy on the Transmission System
2010, Turn-key project
110/10 kV GIS Substation in GSA, Elbasan
2009, Turn-key project
Automation of Metering System in PRO Oil Store Station in Porto-Romano
2005, Turn-key project
Measuring of Electrical Energy in Power Transmission System – Second Phase
2005, Turn-key project
Rehabilitation of unit generators at Fierza and Vau Dejes HPP
2004, Turn-key project
Replace of Primary Equipment in 220 & 110 kVSubstations (Tirana, Fier, Burrel and Elbasan)
2004, Turn-key project
Measuring of Electrical Energy in Power Transmission System